Austin ISD Norman Elementary School HVAC Renovations Commissioning Report Prepared for Austin Independent School District (AISD) Austin, Texas Under Task Order #28

Show full item record

Title: Austin ISD Norman Elementary School HVAC Renovations Commissioning Report Prepared for Austin Independent School District (AISD) Austin, Texas Under Task Order #28
Author: Zeig, M. Jr; Napper, G.; Wei, G.; Turner, D.
Abstract: The Energy Systems Laboratory (ESL) of Texas A&M University was contracted by AISD to perform commissioning on the HVAC renovations project at Norman Elementary School. ESL engineers visited the school on April 27-28, 2006 to commission the new HVAC equipment. At the time of the visit, the equipment had been operating between 6 and 8 months with satisfactory results.
URI: http://handle.tamu.edu/1969.1/88059
Date: 2006-06

Files in this item

Files Size Format View
ESL-TR-06-06-03.pdf 640.3Kb application/pdf View/Open

The following license files are associated with this item:

This item appears in the following Collection(s)

Show full item record