Austin ISD Campbell Elementary School HVAC Renovations Commissioning Report Prepared for Austin Independent School District(AISD) Austin, Texas Under Task Order #26
Visit the Energy Systems Laboratory Homepage.
| Title: | Austin ISD Campbell Elementary School HVAC Renovations Commissioning Report Prepared for Austin Independent School District(AISD) Austin, Texas Under Task Order #26 |
| Author: | Zeig, M. Jr; Napper, G.; Wei, G.; Turner, D. |
| Abstract: | The Energy Systems Laboratory (ESL) of Texas A&M University was contracted by AISD to perform commissioning on the HVAC renovations project at Campbell Elementary School. ESL engineers visited the school on May 8-10, 2006 to commission the new HVAC equipment. At the time of the visit, the equipment had been operating between 6 and 8 months. |
| URI: | http://handle.tamu.edu/1969.1/88058 |
| Date: | 2006-06 |
Files in this item
| Files | Size | Format | View |
|---|---|---|---|
| ESL-TR-06-06-02.pdf | 358.8Kb | application/pdf |
View/ |
The following license files are associated with this item:
This item appears in the following Collection(s)
-
Technical Reports
Technical Reports from the Energy Systems Laboratory
Browse